BoomTrucks.ca
Request a quote

Guide · Sheet G-403

How close a boom truck may work to a power line

The distance is measured to the boom, the load and the rigging, not to where the truck parks. Here are the limits of approach in each province and territory we checked, and the extra steps each regulation adds.

Sheet G-403Checked 2026-10-0610 min read18 sources

7 mWithin this distance of an overhead line, Alberta employers must find the voltage and set the limit of approach first2
3 to 5 mFor the same 138 kV line: 3 m in Ontario, 4.0 m in Alberta, 4.5 m in BC, 4.6 m in Saskatchewan, 5 m in Quebec62347
5.5 mDistance Newfoundland and Labrador requires when the utility has not given the clearance in writing11

Summary only

This is a summary of the rules as checked on 2026-10-06, not a work procedure. Before a boom truck sets up within reach of an overhead line, call the utility that owns it to confirm the voltage and the distance, read the regulation in the sources, and treat the line as energized until the owner confirms otherwise in writing.

Every regulation we checked sets a minimum distance by voltage; most add who must be told and who must watch.

R 03 mWhy the boom, not the truck, is the hazard

A boom truck can park well clear of a line and still put its boom tip, hook or load inside the limit of approach once it swings, extends or booms up.

Three things shrink the real gap:

  • The boom deflects. IHSA notes that radius grows under load as the boom and machine deflect1, so the tip moves toward the line on the pick.
  • The load swings. Plan to the nearest point the load could reach, not where it hangs at rest.
  • The line moves. Conductors sag and sway. Measure from the nearest conductor and leave room.

Every table is keyed to voltage, and you cannot read voltage off a pole. Alberta makes finding it the employer's duty within 7 m of a line2. Ask the line's owner.

Before the truck arrives

  1. Mark every overhead line the boom could reach, in every direction it might swing.
  2. Get each line's voltage from its owner, in writing where you can.
  3. Look up the distance with the power-line lookup.
  4. Choose a set-up position where the boom cannot reach that distance, or agree with the owner what happens instead.
  5. Put the line on the quote request: the supplier plans the truck and its position.

R 06 mThe distances side by side

Each jurisdiction's bands, as its regulation writes them. Voltages are phase to phase.

Minimum distance from an overhead line, by jurisdiction
JurisdictionVoltage bands and minimum distancesRule
Alberta0–750 V: 1.0 m bare, 0.3 m insulated; 750 V–40 kV: 3.0 m; 69 and 72 kV: 3.5 m; 138 and 144 kV: 4.0 m; 230 and 260 kV: 5.0 m; 500 kV: 7.0 mSchedule 42
British ColumbiaOver 750 V–75 kV: 3 m; over 75–250 kV: 4.5 m; over 250–550 kV: 6 mTable 19-1A3
Saskatchewan0.75–25 kV: 3 m; 72 and 138 kV: 4.6 m; 230 kV: 6.1 mTable 19, column 14
ManitobaNo table in our rows; within 3 m, the electrical authority sets the termsPart 255
Ontario750 V–150 kV: 3 m; over 150–250 kV: 4.5 m; over 250 kV: 6 ms.1886
QuebecUnder 125 kV: 3 m; 125–250 kV: 5 m; 250–550 kV: 8 m; over 550 kV: 12 ms.5.2.17
New BrunswickUp to 750 V: 0.9 m; 750 V–100 kV: 3.6 m; 100–250 kV: 5.2 m; 250–345 kV: 6.1 ms.2898
Nova ScotiaUnder 750 V: 1 m; 750 V–69 kV: 3.0 m; over 69–138 kV: 5.0 m; over 138 kV: 6.0 m; 6.0 m if the voltage is unknownOSGR s.1269
Prince Edward IslandUp to 750 V: 0.9 m; 751 V–100 kV: 3.6 m; 100–250 kV: 5.2 m; 250–345 kV: 6.1 m; above 345 kV, the utility's instructions firsts.36.20–36.2110
Newfoundland and LabradorOver 750 V–75 kV: 3 m; 75–250 kV: 4.5 m; 250–550 kV: 6 m; 5.5 m when the utility gives no written clearances.49811
Northwest TerritoriesUp to 25 kV: 3 m; 72 and 138 kV: 4.6 m; 230 kV: 6.1 mSchedule Y, column 312
Yukon0–750 V: 1.0 m; 750 V–40 kV: 3.0 m; 69 and 72 kV: 3.5 m; 138 and 144 kV: 4.0 m; 230 and 260 kV: 5.0 m; 500 kV: 7.0 m; 7.0 m if the voltage is not determinedTable 9-113
Nunavut0.75, 4.16, 15 and 25 kV: 3 m; 72 and 138 kV: 4.6 m; 230 kV: 6.1 m; nothing tabled between those voltagesSchedule Y, column 314

Three example voltages, read from the bands above:

Example voltages: the distance each table gives
Jurisdiction25 kV138 kV230 kV
Alberta and Yukon3.0 m4.0 m5.0 m213
British Columbia3 m4.5 m4.5 m3
Saskatchewan3 m4.6 m6.1 m4
Ontario3 m3 m4.5 m6
Quebec3 m5 m5 m7
New Brunswick and PEI3.6 m5.2 m5.2 m810
Newfoundland and Labrador3 m4.5 m4.5 m11
Northwest Territories and Nunavut3 m4.6 m6.1 m1214

Two reading rules. At a band boundary, use the larger distance. A voltage between bands has no distance in these rows: Alberta and Yukon list nothing between 40 kV and 69 kV, Saskatchewan and Nunavut nothing between 25 kV and 72 kV. Get those distances in writing from the line's owner; the lookup deliberately shows no number.

R 09 mAlberta: the 7 m trigger and Schedule 4

Alberta's rule starts at 7 m: within 7 metres of an overhead line, the employer must determine its voltage, set the limit of approach from Schedule 42 and keep all work and equipment at least that far away2.

Below 750 V, Schedule 4 allows 300 mm for insulated or polyethylene-covered conductors and 1.0 m for bare ones2, but only when they are covered along their entire length2.

Working closer. Before any work goes inside the Schedule 4 distance, the employer must notify the line's operator and get its help protecting the workers2.

Two rules that catch sites out. Earth and other materials must not be placed where they would cut the clearance below the limit, and every worker has a personal duty to keep the distance2. The s.227 exemption covers only utility workers working to CAN/ULC-S801-142. More in boom truck and picker rules in Alberta.

R 12 mBritish Columbia: written assurances and safety watchers

WorkSafeBC's Table 19-1A has three bands, from 3 m (10 ft) over 750 V3 to 6 m (20 ft) over 250 kV3, phase to phase. Part 14 applies it to the crane, its rigging and its load15.

When the distance cannot be kept, BC asks for paper and people. A written assurance from the owner of the power system is required, and where the lines cannot be isolated, rerouted or guarded, the area must be barricaded and a safety watcher with a positive stop signal designated3. The operator must stop on a stop signal from anyone15.

BC's critical lifts include, beside a lift over 90% of rated capacity at more than half the maximum radius, any lift over or between energized high-voltage conductors15. That brings a written lift plan and a documented pre-job meeting15; see planning a boom truck lift.

Table 19-1A starts above 750 V; for lower voltages, ask the owner. More in boom trucks and crane trucks in British Columbia.

R 15 mOntario: written procedures and a signaller

Ontario's construction regulation keeps every object at least 3 m from an energized overhead conductor of 750 V up to 150,000 V6, rising to 6 m above 250,000 V6.

The first band is wide: a 138 kV line needs 3 m in Ontario where Alberta asks 4.0 m62.

Where a crane could encroach on the distance, two more rules apply:

  • Written measures and procedures. The constructor sets them, including warning devices, written notice to the operator and a sign at the operator's station6.
  • A designated signaller. A competent worker is stationed in full view of the operator, with a clear view of the conductor, and warns each time the equipment or load may approach the minimum distance6.

The signaller watches the line while the operator watches the load. On an industrial establishment, Regulation 851 keeps the same three distances16 and stations a worker to warn the operator16. More in boom trucks in Ontario.

R 18 mSaskatchewan, Manitoba and the territories

Saskatchewan. Table 19, column 1, covers non-electrical workers, material and equipment, from 3 m at 0.75 kV4 to 6.1 m at 230 kV4. A line between 25 kV and 72 kV needs its distance in writing from the owner.

Manitoba. Part 25 works differently. It applies when work or equipment can come within 3 m of an overhead line: the employer must notify the electrical authority, get written confirmation or instructions and, when instructed, assign a signal person with an unobstructed view of the operator5. Treat 3 m as the point where the call is required, not as a safe distance.

Northwest Territories. Schedule Y, column 3, has the same values as Saskatchewan's Table 19, from 3 m up to 25 kV to 6.1 m at 230 kV12.

Yukon. Table 9-1 gives 3.0 m from 750 V to 40 kV, rising to 7.0 m at 500 kV, and 7.0 m applies where the voltage has not been determined13. If the distance cannot be kept, a written assurance signed for the utility is required13. Yukon Energy's own sheet gives 3 m up to 40,000 V and 4 m at 138,000 V17, so ask the utility which applies. We read the WCB's online copy of the regulation, which says it is not the official text.

Nunavut. Its own regulation, Schedule Y, column 3, lists seven single voltages: 3 m at 0.75, 4.16, 15 and 25 kV, 4.6 m at 72 and 138 kV, 6.1 m at 230 kV, the same as the NWT's14. At 31 to 750 V the employer must prevent accidental contact, and no distance is tabled14.

R 21 mQuebec

Quebec's construction safety code has the widest spread of distances we found: any part, load or machinery must stay 3 m from a line under 125,000 V7, and 12 m above 550,000 V7.

Work inside those distances is allowed in three cases only7:

  • the line is de-energized;
  • an agreement with the utility has been sent to the CNESST; or
  • extendable equipment carries a dual-function range-limiting device certified by an engineer, and a trained operator runs it.

The code covers construction; Quebec's rules outside construction were not checked. More in boom trucks in Quebec.

R 24 mAtlantic Canada, and driving under lines

New Brunswick and Prince Edward Island use the same four distances, from 900 mm (up to 750 V) to 6.1 m (250 to 345 kV); New Brunswick applies them to non-qualified workers and to objects8. Above 345 kV, PEI requires the utility's instructions first10.

Newfoundland and Labrador sets 3 m to 6 m by voltage11, and adds paper: before a mobile crane or boom truck works near conductors, the employer must get the voltage and clearance in writing from the utility, or keep 5.5 m11. Operators of equipment that could encroach on a line must first complete a power line hazards training program11.

Nova Scotia keeps its limits in the Occupational Safety General Regulations, s.126, because Part 15 of its newer health and safety regulations is an empty placeholder18. Before work could come closer than the distance, the employer contacts the utility9, and a competent signaller is needed where the operator cannot see the distance or the hoist is closer than its boom length to the line9.

Driving under lines

Four jurisdictions treat travel separately from lifting:

  • Alberta does not apply Schedule 4 to a load or equipment transported under a line when the total height, carrier included, is under 4.15 m2.
  • British Columbia sets passing distances for equipment only moving under exposed conductors: 2 m (over 750 V to 75 kV) to 4 m (250 to 550 kV)3.
  • Saskatchewan keeps vehicles and their loads on public roads at least 0.6 m (25 kV and below) to 1.83 m (230 kV) from exposed energized conductors4.
  • Nunavut sets the same 0.6 m to 1.83 m for vehicles and loads on public roads, with 0.8 m at 72 kV and 1.22 m at 138 kV14.

Elsewhere our research found no travel distance, including Yukon, so assume the operating distance applies unless the regulation says otherwise. Know the truck's travel height with the boom stowed.

Questions people ask

How close can a boom truck work to a power line in Alberta?

Schedule 4 of the OHS Code sets 3.0 m for 750 V to 40 kV, rising to 7.0 m for 500 kV2. Within 7 m of any overhead line, the employer must first determine the voltage and set the distance2.

Does the distance apply to the load and the slings too?

Yes. BC keeps every part of the crane, load line, rigging and load outside the minimum distance15. Ontario applies its 3 m to any object6, and Quebec its 3 m to any part, load or machinery7.

Can a boom truck drive under a power line?

With the boom stowed and enough clearance. Alberta exempts transport below 4.15 m total height2, BC sets passing distances of 2 m to 4 m3, and Saskatchewan and Nunavut 0.6 m to 1.83 m on public roads414. Elsewhere we found no travel distance.

Who do I call before working near a power line?

The line's owner: an electric utility, a rural electrification association or an industrial power producer2. Newfoundland and Labrador requires the clearance in writing, or 5.5 m11; Manitoba requires notice to the electrical authority within 3 m5.

Do I need a signaller near power lines?

In Ontario, yes, wherever a crane could encroach6. In BC, a safety watcher when the distance cannot be kept and the lines cannot be isolated, rerouted or guarded3. In Manitoba, when the electrical authority instructs it within 3 m5. In Nova Scotia, where the operator cannot see the distance or the hoist is closer than its boom length to the line9.

Sources

  1. Hoisting and Rigging Safety Manual (M035)Infrastructure Health & Safety Association (Ontario) · January 2020 printing; verified 2026-10-05
  2. Occupational Health and Safety Code, Alberta Regulation 191/2021 (office consolidation)Alberta King's Printer (Government of Alberta) · Consolidation current as of 2025-03-31 (amendments to AR 210/2024); verified 2026-10-05
  3. OHS Regulation Part 19: Electrical SafetyWorkSafeBC · Online regulation incl. B.C. Reg. 223/2022 (eff. 2023-03-01); verified 2026-10-05
  4. The Occupational Health and Safety Regulations, 2020 (RRS c S-15.1 Reg 10)Government of Saskatchewan (Publications Saskatchewan) · Consolidation as amended by SR 31/2021; verified 2026-10-05
  5. Workplace Safety and Health Regulation, M.R. 217/2006Government of Manitoba (Manitoba Laws) · Consolidation current 2026-09-01 to 2026-10-01 (last amendment M.R. 19/2026); verified 2026-10-05
  6. O. Reg. 213/91: Construction Projects (Occupational Health and Safety Act)Government of Ontario (e-Laws) · Consolidation period from 2026-04-20 (last amendment O. Reg. 116/26); verified 2026-10-05
  7. Code de securite pour les travaux de construction, RLRQ c S-2.1, r. 4 (Safety Code for the construction industry)Gouvernement du Quebec (LegisQuebec) · A jour au 2026-06-01; verified 2026-10-05
  8. General Regulation, N.B. Reg. 91-191 (Occupational Health and Safety Act)Government of New Brunswick (laws.gnb.ca) · Consolidation page states current to 2024-01-01; verified 2026-10-05
  9. Occupational Safety General Regulations, N.S. Reg. 44/1999 (Occupational Health and Safety Act)Government of Nova Scotia (Office of the Registrar of Regulations) · Unofficial consolidation amended to N.S. Reg. 53/2013; the Registry's list shows no later amendment; verified 2026-10-06
  10. Occupational Health and Safety Act General Regulations (EC180/87)Government of Prince Edward Island (Legislative Counsel Office) · Office consolidation current to 2025-01-01; verified 2026-10-05
  11. Occupational Health and Safety Regulations, 2012 (NLR 5/12)House of Assembly of Newfoundland and Labrador · Consolidated text (currency date not captured); verified 2026-10-05
  12. Occupational Health and Safety Regulations, R-039-2015 (Safety Act)Government of the Northwest Territories (Department of Justice) · Consolidation amended to R-090-2024; verified 2026-10-05
  13. Workplace Health and Safety Regulations - Part 9: Electrical SafetyYukon Workers' Safety and Compensation Board · Online regulation text headed 'Effective May 11, 2006'; the Board states its copy is not the official version; verified 2026-10-06
  14. Occupational Health and Safety Regulations, C.R.Nu. R-003-2016 (Safety Act), official consolidationGovernment of Nunavut (Department of Justice, Territorial Printer) · Official consolidation current to 2021-09-28; later amendments R-007-2025 and R-041-2025 were opened and do not touch the cited provisions; verified 2026-10-06
  15. OHS Regulation Part 14: Cranes and HoistsWorkSafeBC · Online regulation; read 2026-10-05
  16. R.R.O. 1990, Reg. 851: Industrial Establishments (Occupational Health and Safety Act)Government of Ontario (e-Laws) · Consolidation period from 2022-07-01 (last amendment O. Reg. 374/22); e-Laws currency date 2026-10-01; verified 2026-10-06
  17. Minimum requirements for unqualified workers and/or equipment operating near overhead power linesYukon Energy (public electric utility) · Information sheet dated February 2025; verified 2026-10-06
  18. Workplace Health and Safety Regulations, N.S. Reg. 52/2013 (Occupational Health and Safety Act)Government of Nova Scotia (Office of the Registrar of Regulations) · Unofficial consolidation amended to N.S. Reg. 163/2025 (effective 2025-09-01); verified 2026-10-06