Calculator · Sheet C-504
Power-line limit of approach lookup
The minimum distance from an overhead line by province and voltage, with the extra rules that apply. Built only from the regulation rows we verified.
R 03 mHow the lookup works
Regulations change
Regulations change. This table was checked on 2026-10-06; read the linked regulation and call the utility before work.
Each province writes its limits of approach as a table of voltage bands, measured phase to phase, with a minimum distance for each band. The lookup holds only the bands we read in each regulation, every one tied to its source row, and follows five rules:
- Exact band: the distance for that band is shown. In Alberta, for example, a 25 kV line falls in the 750 V to 40 kV band, which carries 3.0 m1.
- Between bands, or outside every band: no number. Some tables list single voltages, not ranges; Alberta lists 69 kV and 72 kV at 3.5 m1 but nothing between 40 kV and 69 kV. The lookup says so and asks you to get the distance in writing from the line operator.
- At a band boundary: the larger distance. Prince Edward Island is the one exception: it writes its first band as "up to 750 V" and its next as "751 V", so exactly 750 V returns the 0.9 m band3, and a voltage just over 750 V (below 751 V) is read as the 751 V band.
- "I don't know": the largest distance in the province's table, labelled as such. In Alberta that is 7.0 m, for 500 kV1; lines above the table's highest voltage are not in it, and the result says so. The voltage still has to be found out; within 7 m of a line, Alberta makes that the employer's duty1.
- Manitoba: Part 25 applies when work or equipment can come within 3 m of an overhead line, and the electrical authority sets the distance and conditions in writing4. No number is shown.
The distance applies to every part of the truck, the boom, the load and the rigging. Measure from the nearest conductor and allow for the line and the load swinging.
R 06 mTravelling under a line
Four of the regulations we read treat moving equipment under a line differently from working near it:
- Alberta: the Schedule 4 distances do not apply to a load, equipment or building transported under power lines if the total height, carrier included, is under 4.15 m1.
- British Columbia: Table 19-1B sets passing distances when only moving equipment under exposed conductors: 2 m over 750 V to 75 kV, 3 m for 75 to 250 kV and 4 m for 250 to 550 kV5.
- Saskatchewan: vehicles and their loads on public roads keep at least 0.6 m (25 kV and below) to 1.83 m (230 kV) from exposed energized conductors6.
- Nunavut: vehicles and their loads on public roads keep 0.6 m (0.75 to 25 kV), 0.8 m (72 kV), 1.22 m (138 kV) or 1.83 m (230 kV) from exposed energized conductors2.
Elsewhere: Not covered in our research; the operating distance applies unless the regulation says otherwise. A boom truck travelling with its boom stowed is still a tall vehicle, and a boom that has crept up from its rest is not stowed.
R 09 mThe extra rules that apply
The distance is never the whole rule. The lookup lists these under every answer for the province you choose:
- Alberta: before work within 7 m of a line, the employer determines the voltage and sets the limit of approach1; before working closer than the Schedule 4 distance, the employer notifies the line operator and gets its help protecting workers1.
- British Columbia: if the distances cannot be kept, a written assurance from the power system owner is required, and where lines cannot be isolated, rerouted or guarded, the area is barricaded and a safety watcher with a positive stop signal is designated5. BC's critical-lift definition covers any lift over or between energized high-voltage conductors, as well as lifts over 90% of rated capacity at more than half the maximum radius7.
- Ontario: where a crane could encroach, the constructor sets written measures and procedures, gives written notice to the operator and posts a sign at the operator's station8; a competent worker designated as signaller is stationed in full view of the operator8. On an industrial establishment, Reg. 851 s.60 keeps the same three distances9, with a worker stationed within the operator's view and clearance allowed for boom angle and swing9.
- Manitoba: a signal person with an unobstructed view of the operator is assigned when the electrical authority instructs it4.
- Quebec: work inside the minimum distance is allowed only if the line is de-energized, an agreement with the utility is sent to the CNESST, or the equipment has an engineer-certified range-limiting device and a trained operator10.
- Newfoundland and Labrador: before operating a boom truck near conductors, the employer gets the voltage and clearance in writing from the utility, and without it 5.5 m must be kept11; operators complete a power line hazards training program first11.
- New Brunswick: before work that could come closer than the s.289(1) distance, the employer contacts the authority that owns or operates the line and ensures it is de-energized or insulated or guarded12; a lift over or between energized high voltage conductors is a critical lift, which needs a code of practice12.
- Nova Scotia: before work that could come closer than the table distance, the employer contacts the utility that owns or operates the line and makes sure it is insulated or guarded13; a signaller is required where the operator cannot see the distance or the hoist is closer than its boom length to the line13; with the voltage not known, 6.0 m13.
- Yukon: with the voltage not determined, 7.0 m14; if the Table 9-1 distance cannot be kept, a written assurance signed for the utility is required, and where lines cannot be isolated, rerouted or guarded the area is barricaded and a safety watcher designated14; a crane or hoist is positioned so no part of it, the load line or the load comes inside the distance15. Yukon Energy's own sheet gives 3 m from 0 to 40,000 V and a 7 m danger zone where the voltage is unknown16.
- Nunavut: near conductors at 31 to 750 V no distance is tabled, but the employer must prevent accidental contact2.
R 12 mEvery row behind the lookup
The full table the lookup reads, as checked on 2026-10-06. Voltages are phase to phase. Each row links to its regulation.
| Jurisdiction | Voltage band | Minimum distance | Regulation |
|---|---|---|---|
| Alberta | 0–750 V (bare conductors) | 1.0 m bare, 0.3 m insulated | Alberta OHS Code, s.225 and Schedule 41 |
| Alberta | 750 V to 40 kV | 3.0 m | Alberta OHS Code, s.225 and Schedule 41 |
| Alberta | 69 kV and 72 kV | 3.5 m | Alberta OHS Code, s.225 and Schedule 41 |
| Alberta | 138 kV and 144 kV | 4.0 m | Alberta OHS Code, s.225 and Schedule 41 |
| Alberta | 230 kV and 260 kV | 5.0 m | Alberta OHS Code, s.225 and Schedule 41 |
| Alberta | 500 kV | 7.0 m | Alberta OHS Code, s.225 and Schedule 41 |
| British Columbia | Over 750 V to 75 kV | 3.0 m | BC OHS Regulation, Part 19 (Table 19-1A)5 |
| British Columbia | Over 75 kV to 250 kV | 4.5 m | BC OHS Regulation, Part 19 (Table 19-1A)5 |
| British Columbia | Over 250 kV to 550 kV | 6.0 m | BC OHS Regulation, Part 19 (Table 19-1A)5 |
| Saskatchewan | 0.75 kV to 25 kV | 3.0 m | Saskatchewan OHS Regulations, 2020, Table 196 |
| Saskatchewan | 72 kV and 138 kV | 4.6 m | Saskatchewan OHS Regulations, 2020, Table 196 |
| Saskatchewan | 230 kV | 6.1 m | Saskatchewan OHS Regulations, 2020, Table 196 |
| Manitoba | Any line, when work can come within 3 m | Set by the electrical authority | Manitoba WSH Regulation, Part 254 |
| Ontario | 750 V to 150 kV | 3.0 m | O. Reg. 213/91, s.1888 |
| Ontario | Over 150 kV to 250 kV | 4.5 m | O. Reg. 213/91, s.1888 |
| Ontario | Over 250 kV | 6.0 m | O. Reg. 213/91, s.1888 |
| Quebec | Under 125 kV | 3.0 m | Quebec construction safety code, s.5.2.110 |
| Quebec | 125 kV to 250 kV | 5.0 m | Quebec construction safety code, s.5.2.110 |
| Quebec | 250 kV to 550 kV | 8.0 m | Quebec construction safety code, s.5.2.110 |
| Quebec | Over 550 kV | 12.0 m | Quebec construction safety code, s.5.2.110 |
| New Brunswick | Up to 750 V | 0.9 m | N.B. Reg. 91-191, s.28912 |
| New Brunswick | 750 V to 100 kV | 3.6 m | N.B. Reg. 91-191, s.28912 |
| New Brunswick | 100 kV to 250 kV | 5.2 m | N.B. Reg. 91-191, s.28912 |
| New Brunswick | 250 kV to 345 kV | 6.1 m | N.B. Reg. 91-191, s.28912 |
| Nova Scotia | Under 750 V | 1.0 m | NS Occupational Safety General Regulations, s.12613 |
| Nova Scotia | 750 V up to 69 kV | 3.0 m | NS Occupational Safety General Regulations, s.12613 |
| Nova Scotia | Over 69 kV up to 138 kV | 5.0 m | NS Occupational Safety General Regulations, s.12613 |
| Nova Scotia | Over 138 kV | 6.0 m | NS Occupational Safety General Regulations, s.12613 |
| Prince Edward Island | Up to 750 V | 0.9 m | PEI OHS General Regulations, s.36.203 |
| Prince Edward Island | 751 V to 100 kV | 3.6 m | PEI OHS General Regulations, s.36.203 |
| Prince Edward Island | 100 kV to 250 kV | 5.2 m | PEI OHS General Regulations, s.36.203 |
| Prince Edward Island | 250 kV to 345 kV | 6.1 m | PEI OHS General Regulations, s.36.203 |
| Newfoundland and Labrador | Over 750 V to 75 kV | 3.0 m | NL OHS Regulations, 2012, s.49811 |
| Newfoundland and Labrador | 75 kV to 250 kV | 4.5 m | NL OHS Regulations, 2012, s.49811 |
| Newfoundland and Labrador | 250 kV to 550 kV | 6.0 m | NL OHS Regulations, 2012, s.49811 |
| Yukon | Up to 750 V | 1.0 m | Yukon OHS Regulations, Part 9 (Table 9-1)14 |
| Yukon | 750 V to 40 kV | 3.0 m | Yukon OHS Regulations, Part 9 (Table 9-1)14 |
| Yukon | 69 kV and 72 kV | 3.5 m | Yukon OHS Regulations, Part 9 (Table 9-1)14 |
| Yukon | 138 kV and 144 kV | 4.0 m | Yukon OHS Regulations, Part 9 (Table 9-1)14 |
| Yukon | 230 kV and 260 kV | 5.0 m | Yukon OHS Regulations, Part 9 (Table 9-1)14 |
| Yukon | 500 kV | 7.0 m | Yukon OHS Regulations, Part 9 (Table 9-1)14 |
| Northwest Territories | Up to 25 kV | 3.0 m | NWT OHS Regulations, Schedule Y17 |
| Northwest Territories | 72 kV and 138 kV | 4.6 m | NWT OHS Regulations, Schedule Y17 |
| Northwest Territories | 230 kV | 6.1 m | NWT OHS Regulations, Schedule Y17 |
| Nunavut | 0.75, 4.16, 15 and 25 kV | 3.0 m | Nunavut OHS Regulations, Schedule Y2 |
| Nunavut | 72 kV and 138 kV | 4.6 m | Nunavut OHS Regulations, Schedule Y2 |
| Nunavut | 230 kV | 6.1 m | Nunavut OHS Regulations, Schedule Y2 |
Prince Edward Island's table stops at 345 kV, where its last band is 6.1 m; above that, the utility's instructions are required before work starts3. The Northwest Territories table carries the same values as Saskatchewan's: 3 m, 4.6 m and 6.1 m17. Yukon's Table 9-1 lists the same voltages and distances as Alberta's Schedule 4 from 750 V up, 3.0 m to 40 kV through 7.0 m at 500 kV14.
Questions people ask
How close can a boom truck work to a power line?
It depends on the province and the voltage. For common distribution voltages the distance is 3 m in several provinces: Alberta for 750 V to 40 kV1, Ontario for 750 V to 150 kV8 and Quebec under 125 kV10. New Brunswick sets 3.6 m for 750 V to 100 kV12. Higher voltages need more. Use the lookup for your line.
What if I don't know the line voltage?
Find out before setting up; the lookup shows the largest distance in the province's table only as a placeholder. In Alberta the employer must determine the voltage before work within 7 m of a line1. In Newfoundland and Labrador the employer gets the voltage and clearance in writing from the utility, and without it keeps 5.5 m11.
Is driving under a power line treated differently?
Why does the lookup show no number for some voltages?
Because the province's table does not list them, and filling the gap would be guessing. Saskatchewan, for example, lists 3 m up to 25 kV and 4.6 m for 72 kV and 138 kV6, with nothing in between. Get the distance in writing from the line operator.
What is the rule in Manitoba?
Manitoba's Part 25 applies when work or equipment can come within 3 m of an overhead line. The employer notifies the electrical authority and works to its written confirmation or instructions4.
Sources
- Occupational Health and Safety Code, Alberta Regulation 191/2021 (office consolidation)Alberta King's Printer (Government of Alberta) · Consolidation current as of 2025-03-31 (amendments to AR 210/2024); verified 2026-10-05
- Occupational Health and Safety Regulations, C.R.Nu. R-003-2016 (Safety Act), official consolidationGovernment of Nunavut (Department of Justice, Territorial Printer) · Official consolidation current to 2021-09-28; later amendments R-007-2025 and R-041-2025 were opened and do not touch the cited provisions; verified 2026-10-06
- Occupational Health and Safety Act General Regulations (EC180/87)Government of Prince Edward Island (Legislative Counsel Office) · Office consolidation current to 2025-01-01; verified 2026-10-05
- Workplace Safety and Health Regulation, M.R. 217/2006Government of Manitoba (Manitoba Laws) · Consolidation current 2026-09-01 to 2026-10-01 (last amendment M.R. 19/2026); verified 2026-10-05
- OHS Regulation Part 19: Electrical SafetyWorkSafeBC · Online regulation incl. B.C. Reg. 223/2022 (eff. 2023-03-01); verified 2026-10-05
- The Occupational Health and Safety Regulations, 2020 (RRS c S-15.1 Reg 10)Government of Saskatchewan (Publications Saskatchewan) · Consolidation as amended by SR 31/2021; verified 2026-10-05
- OHS Regulation Part 14: Cranes and HoistsWorkSafeBC · Online regulation incl. B.C. Reg. 176/2024 (eff. 2024-10-01); verified 2026-10-05
- O. Reg. 213/91: Construction Projects (Occupational Health and Safety Act)Government of Ontario (e-Laws) · Consolidation period from 2026-04-20 (last amendment O. Reg. 116/26); verified 2026-10-05
- R.R.O. 1990, Reg. 851: Industrial Establishments (Occupational Health and Safety Act)Government of Ontario (e-Laws) · Consolidation period from 2022-07-01 (last amendment O. Reg. 374/22); e-Laws currency date 2026-10-01; verified 2026-10-06
- Code de securite pour les travaux de construction, RLRQ c S-2.1, r. 4 (Safety Code for the construction industry)Gouvernement du Quebec (LegisQuebec) · A jour au 2026-06-01; verified 2026-10-05
- Occupational Health and Safety Regulations, 2012 (NLR 5/12)House of Assembly of Newfoundland and Labrador · Consolidated text (currency date not captured); verified 2026-10-05
- General Regulation, N.B. Reg. 91-191 (Occupational Health and Safety Act)Government of New Brunswick (laws.gnb.ca) · Consolidation page states current to 2024-01-01; verified 2026-10-06
- Occupational Safety General Regulations, N.S. Reg. 44/1999 (Occupational Health and Safety Act)Government of Nova Scotia (Office of the Registrar of Regulations) · Unofficial consolidation amended to N.S. Reg. 53/2013; the Registry's list shows no later amendment; verified 2026-10-06
- Workplace Health and Safety Regulations - Part 9: Electrical SafetyYukon Workers' Safety and Compensation Board · Online regulation text headed 'Effective May 11, 2006'; the Board states its copy is not the official version; verified 2026-10-06
- Workplace Health and Safety Regulations - Part 5: Cranes, Hoisting and LiftingYukon Workers' Safety and Compensation Board · Online regulation text headed 'Effective May 11, 2006'; the Board states its copy is not the official version; verified 2026-10-06
- Minimum requirements for unqualified workers and/or equipment operating near overhead power linesYukon Energy (public electric utility) · Information sheet dated February 2025; verified 2026-10-06
- Occupational Health and Safety Regulations, R-039-2015 (Safety Act)Government of the Northwest Territories (Department of Justice) · Consolidation amended to R-090-2024; verified 2026-10-05