Power-line limit of approach lookup

The minimum distance from an overhead line by province and voltage, with the extra rules that apply. Built only from the regulation rows we verified.

Sheet C-504Checked 2026-10-0617 sourcesRuns in your browser

Power-line limit of approach lookup · Sheet C-504Table checked 2026-10-06
Ask the utility or line owner. The distance depends on the voltage.
What the truck is doing
—Choose a province and a voltage

Get this priced

Before you rely on the result

Before work

Regulations change. This table was checked on 2026-10-06; read the linked regulation and call the utility before work.

  • Keep every part of the truck, boom, load and rigging at least this far from the line. Measure from the nearest conductor, allowing for the line and the load swinging.
  • Lines move in wind and loads swing. A distance on paper is a minimum, not a target.
  • Nunavut's Schedule Y lists seven single voltages, 0.75 kV to 230 kV, at 3, 4.6 and 6.1 m, so a voltage between two of them, or above 230 kV, shows no distance2.

This is an estimate to help you describe the job, not a lift plan. Every lift must be checked against the manufacturer's load chart for the actual truck and configuration, by a qualified operator, and planned by a competent person (an engineer where your province requires one). Never use this tool to decide that a lift is safe.

Regulations change. This table was checked on 2026-10-06; read the linked regulation and call the utility before work.

R 03 mHow the lookup works

Regulations change

Regulations change. This table was checked on 2026-10-06; read the linked regulation and call the utility before work.

Each province writes its limits of approach as a table of voltage bands, measured phase to phase, with a minimum distance for each band. The lookup holds only the bands we read in each regulation, every one tied to its source row, and follows five rules:

  1. Exact band: the distance for that band is shown. In Alberta, for example, a 25 kV line falls in the 750 V to 40 kV band, which carries 3.0 m1.
  2. Between bands, or outside every band: no number. Some tables list single voltages, not ranges; Alberta lists 69 kV and 72 kV at 3.5 m1 but nothing between 40 kV and 69 kV. The lookup says so and asks you to get the distance in writing from the line operator.
  3. At a band boundary: the larger distance. Prince Edward Island is the one exception: it writes its first band as "up to 750 V" and its next as "751 V", so exactly 750 V returns the 0.9 m band3, and a voltage just over 750 V (below 751 V) is read as the 751 V band.
  4. "I don't know": the largest distance in the province's table, labelled as such. In Alberta that is 7.0 m, for 500 kV1; lines above the table's highest voltage are not in it, and the result says so. The voltage still has to be found out; within 7 m of a line, Alberta makes that the employer's duty1.
  5. Manitoba: Part 25 applies when work or equipment can come within 3 m of an overhead line, and the electrical authority sets the distance and conditions in writing4. No number is shown.

The distance applies to every part of the truck, the boom, the load and the rigging. Measure from the nearest conductor and allow for the line and the load swinging.

R 06 mTravelling under a line

Four of the regulations we read treat moving equipment under a line differently from working near it:

  • Alberta: the Schedule 4 distances do not apply to a load, equipment or building transported under power lines if the total height, carrier included, is under 4.15 m1.
  • British Columbia: Table 19-1B sets passing distances when only moving equipment under exposed conductors: 2 m over 750 V to 75 kV, 3 m for 75 to 250 kV and 4 m for 250 to 550 kV5.
  • Saskatchewan: vehicles and their loads on public roads keep at least 0.6 m (25 kV and below) to 1.83 m (230 kV) from exposed energized conductors6.
  • Nunavut: vehicles and their loads on public roads keep 0.6 m (0.75 to 25 kV), 0.8 m (72 kV), 1.22 m (138 kV) or 1.83 m (230 kV) from exposed energized conductors2.

Elsewhere: Not covered in our research; the operating distance applies unless the regulation says otherwise. A boom truck travelling with its boom stowed is still a tall vehicle, and a boom that has crept up from its rest is not stowed.

R 09 mThe extra rules that apply

The distance is never the whole rule. The lookup lists these under every answer for the province you choose:

  • Alberta: before work within 7 m of a line, the employer determines the voltage and sets the limit of approach1; before working closer than the Schedule 4 distance, the employer notifies the line operator and gets its help protecting workers1.
  • British Columbia: if the distances cannot be kept, a written assurance from the power system owner is required, and where lines cannot be isolated, rerouted or guarded, the area is barricaded and a safety watcher with a positive stop signal is designated5. BC's critical-lift definition covers any lift over or between energized high-voltage conductors, as well as lifts over 90% of rated capacity at more than half the maximum radius7.
  • Ontario: where a crane could encroach, the constructor sets written measures and procedures, gives written notice to the operator and posts a sign at the operator's station8; a competent worker designated as signaller is stationed in full view of the operator8. On an industrial establishment, Reg. 851 s.60 keeps the same three distances9, with a worker stationed within the operator's view and clearance allowed for boom angle and swing9.
  • Manitoba: a signal person with an unobstructed view of the operator is assigned when the electrical authority instructs it4.
  • Quebec: work inside the minimum distance is allowed only if the line is de-energized, an agreement with the utility is sent to the CNESST, or the equipment has an engineer-certified range-limiting device and a trained operator10.
  • Newfoundland and Labrador: before operating a boom truck near conductors, the employer gets the voltage and clearance in writing from the utility, and without it 5.5 m must be kept11; operators complete a power line hazards training program first11.
  • New Brunswick: before work that could come closer than the s.289(1) distance, the employer contacts the authority that owns or operates the line and ensures it is de-energized or insulated or guarded12; a lift over or between energized high voltage conductors is a critical lift, which needs a code of practice12.
  • Nova Scotia: before work that could come closer than the table distance, the employer contacts the utility that owns or operates the line and makes sure it is insulated or guarded13; a signaller is required where the operator cannot see the distance or the hoist is closer than its boom length to the line13; with the voltage not known, 6.0 m13.
  • Yukon: with the voltage not determined, 7.0 m14; if the Table 9-1 distance cannot be kept, a written assurance signed for the utility is required, and where lines cannot be isolated, rerouted or guarded the area is barricaded and a safety watcher designated14; a crane or hoist is positioned so no part of it, the load line or the load comes inside the distance15. Yukon Energy's own sheet gives 3 m from 0 to 40,000 V and a 7 m danger zone where the voltage is unknown16.
  • Nunavut: near conductors at 31 to 750 V no distance is tabled, but the employer must prevent accidental contact2.

R 12 mEvery row behind the lookup

The full table the lookup reads, as checked on 2026-10-06. Voltages are phase to phase. Each row links to its regulation.

Limits of approach for equipment near overhead lines
JurisdictionVoltage bandMinimum distanceRegulation
Alberta0–750 V (bare conductors)1.0 m bare, 0.3 m insulatedAlberta OHS Code, s.225 and Schedule 41
Alberta750 V to 40 kV3.0 mAlberta OHS Code, s.225 and Schedule 41
Alberta69 kV and 72 kV3.5 mAlberta OHS Code, s.225 and Schedule 41
Alberta138 kV and 144 kV4.0 mAlberta OHS Code, s.225 and Schedule 41
Alberta230 kV and 260 kV5.0 mAlberta OHS Code, s.225 and Schedule 41
Alberta500 kV7.0 mAlberta OHS Code, s.225 and Schedule 41
British ColumbiaOver 750 V to 75 kV3.0 mBC OHS Regulation, Part 19 (Table 19-1A)5
British ColumbiaOver 75 kV to 250 kV4.5 mBC OHS Regulation, Part 19 (Table 19-1A)5
British ColumbiaOver 250 kV to 550 kV6.0 mBC OHS Regulation, Part 19 (Table 19-1A)5
Saskatchewan0.75 kV to 25 kV3.0 mSaskatchewan OHS Regulations, 2020, Table 196
Saskatchewan72 kV and 138 kV4.6 mSaskatchewan OHS Regulations, 2020, Table 196
Saskatchewan230 kV6.1 mSaskatchewan OHS Regulations, 2020, Table 196
ManitobaAny line, when work can come within 3 mSet by the electrical authorityManitoba WSH Regulation, Part 254
Ontario750 V to 150 kV3.0 mO. Reg. 213/91, s.1888
OntarioOver 150 kV to 250 kV4.5 mO. Reg. 213/91, s.1888
OntarioOver 250 kV6.0 mO. Reg. 213/91, s.1888
QuebecUnder 125 kV3.0 mQuebec construction safety code, s.5.2.110
Quebec125 kV to 250 kV5.0 mQuebec construction safety code, s.5.2.110
Quebec250 kV to 550 kV8.0 mQuebec construction safety code, s.5.2.110
QuebecOver 550 kV12.0 mQuebec construction safety code, s.5.2.110
New BrunswickUp to 750 V0.9 mN.B. Reg. 91-191, s.28912
New Brunswick750 V to 100 kV3.6 mN.B. Reg. 91-191, s.28912
New Brunswick100 kV to 250 kV5.2 mN.B. Reg. 91-191, s.28912
New Brunswick250 kV to 345 kV6.1 mN.B. Reg. 91-191, s.28912
Nova ScotiaUnder 750 V1.0 mNS Occupational Safety General Regulations, s.12613
Nova Scotia750 V up to 69 kV3.0 mNS Occupational Safety General Regulations, s.12613
Nova ScotiaOver 69 kV up to 138 kV5.0 mNS Occupational Safety General Regulations, s.12613
Nova ScotiaOver 138 kV6.0 mNS Occupational Safety General Regulations, s.12613
Prince Edward IslandUp to 750 V0.9 mPEI OHS General Regulations, s.36.203
Prince Edward Island751 V to 100 kV3.6 mPEI OHS General Regulations, s.36.203
Prince Edward Island100 kV to 250 kV5.2 mPEI OHS General Regulations, s.36.203
Prince Edward Island250 kV to 345 kV6.1 mPEI OHS General Regulations, s.36.203
Newfoundland and LabradorOver 750 V to 75 kV3.0 mNL OHS Regulations, 2012, s.49811
Newfoundland and Labrador75 kV to 250 kV4.5 mNL OHS Regulations, 2012, s.49811
Newfoundland and Labrador250 kV to 550 kV6.0 mNL OHS Regulations, 2012, s.49811
YukonUp to 750 V1.0 mYukon OHS Regulations, Part 9 (Table 9-1)14
Yukon750 V to 40 kV3.0 mYukon OHS Regulations, Part 9 (Table 9-1)14
Yukon69 kV and 72 kV3.5 mYukon OHS Regulations, Part 9 (Table 9-1)14
Yukon138 kV and 144 kV4.0 mYukon OHS Regulations, Part 9 (Table 9-1)14
Yukon230 kV and 260 kV5.0 mYukon OHS Regulations, Part 9 (Table 9-1)14
Yukon500 kV7.0 mYukon OHS Regulations, Part 9 (Table 9-1)14
Northwest TerritoriesUp to 25 kV3.0 mNWT OHS Regulations, Schedule Y17
Northwest Territories72 kV and 138 kV4.6 mNWT OHS Regulations, Schedule Y17
Northwest Territories230 kV6.1 mNWT OHS Regulations, Schedule Y17
Nunavut0.75, 4.16, 15 and 25 kV3.0 mNunavut OHS Regulations, Schedule Y2
Nunavut72 kV and 138 kV4.6 mNunavut OHS Regulations, Schedule Y2
Nunavut230 kV6.1 mNunavut OHS Regulations, Schedule Y2

Prince Edward Island's table stops at 345 kV, where its last band is 6.1 m; above that, the utility's instructions are required before work starts3. The Northwest Territories table carries the same values as Saskatchewan's: 3 m, 4.6 m and 6.1 m17. Yukon's Table 9-1 lists the same voltages and distances as Alberta's Schedule 4 from 750 V up, 3.0 m to 40 kV through 7.0 m at 500 kV14.

Questions people ask

How close can a boom truck work to a power line?

It depends on the province and the voltage. For common distribution voltages the distance is 3 m in several provinces: Alberta for 750 V to 40 kV1, Ontario for 750 V to 150 kV8 and Quebec under 125 kV10. New Brunswick sets 3.6 m for 750 V to 100 kV12. Higher voltages need more. Use the lookup for your line.

What if I don't know the line voltage?

Find out before setting up; the lookup shows the largest distance in the province's table only as a placeholder. In Alberta the employer must determine the voltage before work within 7 m of a line1. In Newfoundland and Labrador the employer gets the voltage and clearance in writing from the utility, and without it keeps 5.5 m11.

Is driving under a power line treated differently?

In some provinces. Alberta exempts loads and equipment under 4.15 m total height from its Schedule 4 distances when transported under a line1, and British Columbia sets passing distances of 2, 3 and 4 m by voltage band5.

Why does the lookup show no number for some voltages?

Because the province's table does not list them, and filling the gap would be guessing. Saskatchewan, for example, lists 3 m up to 25 kV and 4.6 m for 72 kV and 138 kV6, with nothing in between. Get the distance in writing from the line operator.

What is the rule in Manitoba?

Manitoba's Part 25 applies when work or equipment can come within 3 m of an overhead line. The employer notifies the electrical authority and works to its written confirmation or instructions4.

Sources

  1. Occupational Health and Safety Code, Alberta Regulation 191/2021 (office consolidation)Alberta King's Printer (Government of Alberta) · Consolidation current as of 2025-03-31 (amendments to AR 210/2024); verified 2026-10-05
  2. Occupational Health and Safety Regulations, C.R.Nu. R-003-2016 (Safety Act), official consolidationGovernment of Nunavut (Department of Justice, Territorial Printer) · Official consolidation current to 2021-09-28; later amendments R-007-2025 and R-041-2025 were opened and do not touch the cited provisions; verified 2026-10-06
  3. Occupational Health and Safety Act General Regulations (EC180/87)Government of Prince Edward Island (Legislative Counsel Office) · Office consolidation current to 2025-01-01; verified 2026-10-05
  4. Workplace Safety and Health Regulation, M.R. 217/2006Government of Manitoba (Manitoba Laws) · Consolidation current 2026-09-01 to 2026-10-01 (last amendment M.R. 19/2026); verified 2026-10-05
  5. OHS Regulation Part 19: Electrical SafetyWorkSafeBC · Online regulation incl. B.C. Reg. 223/2022 (eff. 2023-03-01); verified 2026-10-05
  6. The Occupational Health and Safety Regulations, 2020 (RRS c S-15.1 Reg 10)Government of Saskatchewan (Publications Saskatchewan) · Consolidation as amended by SR 31/2021; verified 2026-10-05
  7. OHS Regulation Part 14: Cranes and HoistsWorkSafeBC · Online regulation incl. B.C. Reg. 176/2024 (eff. 2024-10-01); verified 2026-10-05
  8. O. Reg. 213/91: Construction Projects (Occupational Health and Safety Act)Government of Ontario (e-Laws) · Consolidation period from 2026-04-20 (last amendment O. Reg. 116/26); verified 2026-10-05
  9. R.R.O. 1990, Reg. 851: Industrial Establishments (Occupational Health and Safety Act)Government of Ontario (e-Laws) · Consolidation period from 2022-07-01 (last amendment O. Reg. 374/22); e-Laws currency date 2026-10-01; verified 2026-10-06
  10. Code de securite pour les travaux de construction, RLRQ c S-2.1, r. 4 (Safety Code for the construction industry)Gouvernement du Quebec (LegisQuebec) · A jour au 2026-06-01; verified 2026-10-05
  11. Occupational Health and Safety Regulations, 2012 (NLR 5/12)House of Assembly of Newfoundland and Labrador · Consolidated text (currency date not captured); verified 2026-10-05
  12. General Regulation, N.B. Reg. 91-191 (Occupational Health and Safety Act)Government of New Brunswick (laws.gnb.ca) · Consolidation page states current to 2024-01-01; verified 2026-10-06
  13. Occupational Safety General Regulations, N.S. Reg. 44/1999 (Occupational Health and Safety Act)Government of Nova Scotia (Office of the Registrar of Regulations) · Unofficial consolidation amended to N.S. Reg. 53/2013; the Registry's list shows no later amendment; verified 2026-10-06
  14. Workplace Health and Safety Regulations - Part 9: Electrical SafetyYukon Workers' Safety and Compensation Board · Online regulation text headed 'Effective May 11, 2006'; the Board states its copy is not the official version; verified 2026-10-06
  15. Workplace Health and Safety Regulations - Part 5: Cranes, Hoisting and LiftingYukon Workers' Safety and Compensation Board · Online regulation text headed 'Effective May 11, 2006'; the Board states its copy is not the official version; verified 2026-10-06
  16. Minimum requirements for unqualified workers and/or equipment operating near overhead power linesYukon Energy (public electric utility) · Information sheet dated February 2025; verified 2026-10-06
  17. Occupational Health and Safety Regulations, R-039-2015 (Safety Act)Government of the Northwest Territories (Department of Justice) · Consolidation amended to R-090-2024; verified 2026-10-05